Step 1: Basic information
BIM-Workflow Project

Please fill in the details for your project below, and we will prepare an offer based specifically on your project requirements.

Your Name *
Business Email *
Preferred timeline of project
Phone
Address of the Building to be digitalized*
Name of the firm*
Step 1 out of 7
*required information for quotation preparation.
Step 2: Type of Building
Please choose the type of building that needs to be digitalized.

If the building type of your asset is not listed, please use the custom field at the bottom.

Other building type
Step 2 out of 7
*required information for quotation preparation.
Step 3: Specific Project Details
Project specifications

Please specify the scope of the project and the type of BIM-model you would require for your building.

How many square meters of Gross Floor Area does the building or the portfolio of building have?

Gross Floor Area *
Net Floor Area
You can also provide an approximate estimate of the area. The actual built area of the building will be measured in the surveying phase.

Which type of Building Information Model you require for your building assets? *

You can choose any combination or all.

Step 3 out of 7
*required information for quotation preparation.
Step 4: Specific Project Details
Please select the level of detail required

You can choose to upgrade the model to a higher level of detail.

Which BIM-software would you like your Digital Asset to be built in?
Step 4 out of 7
*additional information can be added here.
Step 5: Customize LOD specification
Would you like to customize the level of detail as per your specific project requirements?

Please choose the elements that you require. You can choose any custom combination of model category, building element and corresponding LOD for each building element.

  • Specific furniture, in-built furniture, railings, lifts, escalators, kitchen appliances.
  • Roofing, battens, roofing layers, thermal insulation, vapour barrier, roof trusses and timber structure.
  • Concrete slab, water-proofing layer, insulating layer, binding layer, floor finishing, skirting, floor openings.
  • Load bearing walls, dry walls, wall material layers, wall cladding.
  • Facade system, facade subdivision, mullions, coverings, glazing, facade windows and doors.
  • Lintel, parapet, window frame, casement frame, post, glazing bars, window handle, window sill and glazing.
  • Door frame, rebate trim, door leaf, door hinges, lining, door handle, lock case, threshold.
  • Concrete/Wooden stairs, step cladding, staircase railing.
  • Rooms and Room Stamps
  • Dimension Lines
  • Level Markers
  • Door & Window Markers
  • Project specific annotations
  • As per project specific use-case requirements.
  • In-built Furniture, railings, kitchen appliances.
  • Roofing and primary roof trusses.
  • Concrete slab, floor finishing, floor openings.
  • Concrete Staircase and step cladding.
  • Facade system, facade subdivision, mullions and glazing.
  • Lintel, parapet, window frame, casement frame, post, glazing bars, window handle, window sill and glazing.
  • Door frame, door leaf and door handle.
  • Concrete stairs and step cladding.
  • Rooms and Room Stamps
  • Dimension Lines
  • Level Markers
  • Door & Window Markers
  • As per project specific use-case requirements
  • In-built Furniture, kitchen appliances.
    (as placeholder block with outer dimensions)
  • Roofing (outer dimensions without trusses)
  • Slab (total thickness without layers)
  • Walls (total thickness without layers)
  • Facade system with subdivision.
  • Window frame with glazing.
  • Door frame with door leaf.
  • Stairs (total thickness including step cladding)
  • Rooms and Room Stamps
  • Dimension Lines
  • Level Markers
  • As per project specific use-case requirements
  • None
  • Roofing (outer dimensions without trusses)
  • Slab (total thickness without layers)
  • Walls (total thickness without layers)
  • Facade system with subdivision.
  • Window Opening
  • Door Opening
  • Stairs (total thickness including step cladding)
  • Rooms and Room Stamps
  • As per project specific use-case requirements
  • Load-Bearing System, Load-Bearing Columns & Beams, Steel anchors & bolts, Expansion joints, Foundation.
  • Load-Bearing System, DIN277 Steel Profile Beams & Columns, Steel Framing, Fishers, Bolts, Connectors, Plating, Steel mesh & grating.
  • Timber Beams & Columns, Wooden Rafters, Wooden Struts, Wooden Bracers, Wooden ceiling joists, special wooden cladding and construction.
  • As per project specific use-case requirements
  • Load-Bearing System, Load-Bearing Columns & Beams, Foundation.
  • Load-Bearing System, DIN277 Steel Profile Beams & Columns, Steel Framing, Steel mesh & grating.
  • Timber Beams & Columns, Wooden Rafters, Wooden Struts, Wooden Bracers.
  • As per project specific use-case requirements
  • Load-Bearing System, Load-Bearing Columns & Beams.
  • Load-Bearing System, DIN277 Steel Profile Beams & Columns, Steel Framing.
  • Timber Beam, Columns & Rafters.
  • As per project specific use-case requirements
  • Concrete Beams & Columns
  • Steel Beams & Columns
  • Wooden Beams & Columns
  • As per project specific use-case requirements
  • Boiler, Boiler accessories, Radiators, Heating Plumbing, Plumbing attachments & accessories, Pipe Insulation.
  • Fire Safety Plumbing, Plumbing attachments & accessories, Sprinklers, Fire Extinguishers, Fire Alarms, Fire Alarm Control Unit, Smoke/Heat Sensors, fire escape route signboards.
  • Air conditioning system, Indoor/Outdoor units, Ventilation ducts, Duct fittings, control devices, Air diffuser & outlets.
  • Sanitary objects, freshwater plumbing, waste water plumbing, hot water plumbing, plumbing fittings & accessories.
  • Cable trays, Cable tray fittings & accessories, Electrical Piping, pipe fittings, Sockets & Switches, Lamps & Lighting, Cables, Circuit Breakers & Fuse Boxes.
  • Smart devices control units, control panels, Audio-Visual devices, Security cameras, Actuators, Internet devices, Security devices, communication devices, alarm devices.
  • Photovoltaic Panels, Investors, Battery system, photovoltaic electrical routing and accessories.
  • As per project specific use-case requirements
  • Boiler, Boiler accessories, Radiators, Heating Plumbing, Plumbing fittings
  • Fire Safety Plumbing, plumbing fittings, Sprinklers, Fire Extinguishers, Fire Alarms, Smoke/Heat Sensors.
  • Air conditioning system, Indoor/Outdoor units, Ventilation ducts, Duct fittings & outlets.
  • Sanitary objects, freshwater plumbing, waste water plumbing, hot water plumbing.
  • Cable trays, Cable tray fittings, Electrical Piping, pipe fittings, Sockets & Switches, Lamps & Lighting, Fuse Boxes.
  • Smart devices control units, control panels, Actuators.
  • Photovoltaic Panels, Investors, Battery system.
  • As per project specific use-case requirements
  • Radiators & Heating Plumbing.
  • Fire Safety Plumbing, Sprinklers, Fire Extinguishers.
  • Air-conditioning units & Ventilation ducts.
  • Sanitary objects and Plumbing (undifferentiated).
  • Cable trays, Cable tray fittings, Fuse Boxes.
  • General Smart devices.
  • Photovoltaic Panels.
  • As per project specific use-case requirements
  • Radiators (as blocks)
  • Smoke/Heat Detectors (as blocks)
  • Air-conditioning units (as blocks)
  • Sanitary objects (as blocks)
  • Cable trays (as blocks)
  • None
  • None
  • As per project specific use-case requirements
  • Topography, General Landscape Elements, Parking, Bicycle Stands, Trees & Vegetation, Surrounding, Adjoining Buildings as blocks, Footpaths, Streets, Terraces, Storage Units.
  • Dimension Lines
  • Level Markers
  • Project specific annotations
  • As per project specific use-case requirements
  • Topography, General Landscape Elements, Parking, Bicycle Stands, Trees & Vegetation, Surrounding, Adjoining Buildings as blocks.
  • Dimension Lines
  • Level Markers
  • Project specific annotations
  • As per project specific use-case requirements
  • Topography, General Landscape Elements, Surrounding, Adjoining Buildings as blocks.
  • Level Markers
  • Project specific annotations
  • As per project specific use-case requirements
  • Topography.
  • Project specific annotations
  • As per project specific use-case requirements
Step 5 out of 7
Please skip this step if you would like to keep the standard LOD chosen in the previous step.
Step 6: Use-cases of your digital asset
Which use-cases are the focus of your building digitalization project?

You are welcome to choose multiple use-cases for your digital asset.

Other use-cases
Step 6 out of 8
*required information for quotation preparation.
Step 7: Data Availability
Which of the following data is already available to you for the digitalization process?

You are welcome to choose multiple use-cases for your digital asset.

1. Is there 3D-Pointcloud data already available from the buildings? *
2. Are there accurate 2D-CAD Drawings available for the buildings? *
3. Are there any 3D-models available for the buildings? *
4. Is there accurate building documentation available for all technical systems in the building? *
5. Is there accurate photo documentation available for the building? *
Step 7 out of 8
*required information for quotation preparation.
Step 8: Submit Quotation Request
We are ready to prepare the offer for digitalizing your building asset.

Would you like to add any important information or notes for us that are relevant for the project?

Step 8 out of 8
Thank you so much for your project request.

We are delighted to have your interest in digitalizing your building assets. We will immediately work on preparing a quotation with the best suitable workflow for your project. Meanwhile, we are gladly available to you for any questions or support regarding the project or our workflows.

We will contact you shortly and discuss the project-specific details and our strategy to deliver you the BIM Digital Twins of your building assets at the most optimum prices possible.
Oops! Something went wrong while submitting the form. Please consider refreshing the page and trying again. If the problem persists, please contact us via support.

Please use the Desktop version for accessing the Dashboard.